|
|
---|
Friday, April 29, 2011
Nathan Phillips Square construction continues: The washroom/skate rental/elevator building has been ripped down and its replacement is going up and the Peace Garden/Eternal Flame have also been removed, apparently the flame was just temporary. Here is a shot of the Peace Garden dismantling going on during winter. You can check out the winning design here.
The flags along Bay Street are still up.
The flags along Bay Street are still up.
Labels: Nathan Phillips Square, Toronto
0 Comments:
Subscribe to:
Post Comments (Atom)